A locality needs the means to maintain its buildings. Houses, workshops, food stores and agricultural buildings all require repair. Some new buildings will also be needed, even in a shrinking economy.
Local brickmaking could provide part of that essential capacity. It brings together a natural resource, skilled labour and a durable product. Where suitable clay and an affordable source of heat are available, a brickworks could serve several neighbouring localities.
The starting point should be the preservation of existing works and their knowledge. Establishing a new brickworks becomes much harder if the people who understand clay preparation, drying and firing have disappeared.
Examples which survive
Northcot Brick at Blockley in Gloucestershire uses clay from its own quarry. It retains handmade brickmaking alongside machine production. The works was established in 1925 partly to provide housing and employment for local people. That original purpose has a clear connection with localism.
H.G. Matthews, near Chesham in Buckinghamshire, produces handmade wood-fired bricks. It also uses woodchip to provide heat for drying. Its experience offers a practical connection between brickmaking and a wood economy.
Bulmer Brick & Tile, near Sudbury, is a small family business using clay from its own seams. Its specialised bricks support the repair of existing buildings. York Handmade Brick at Alne in North Yorkshire provides another example of an independent manufacturer with a brickworks and quarry site.
These businesses demonstrate that the skills survive. They do not establish that every locality could produce cheap bricks. Their methods, fuel requirements and costs would need careful examination.
Repair before expansion
In a shrinking economy, the purpose of a local brickworks would increasingly be to maintain useful buildings.
Repairing a wall or extending a workshop may require relatively few bricks. Matching older brick sizes and shapes can be especially valuable. A small works could develop its business around these needs.
Reclamation could form a complementary activity. Suitable bricks recovered from demolition could be sorted, assessed and offered for reuse. New bricks would fill the gaps which reclaimed supplies cannot meet.
Reclaimed bricks still need assessment for their intended use. Their previous survival does not establish that every brick is suitable for an exposed external wall.
How to establish a small brickworks
The first task is to investigate demand. Local builders, property owners and conservation specialists could identify the sizes, quantities and types of brick they need. This would help determine whether a works could support itself.
A local enterprise needs enough regular orders to cover wages, fuel, maintenance and the occasional unsuccessful batch.
The second task is to investigate the clay. A deposit which looks suitable may crack during drying or distort during firing. Samples should be examined by a ceramics laboratory and used to make trial bricks. Tests establish how the material behaves and whether blending is necessary.
Trial batches should, where possible, be fired in an existing suitable kiln. This allows the clay and proposed product to be assessed before money is committed to a permanent works.
Choosing and arranging the site
A suitable site would bring together clay supply, water, fuel storage, access and enough space to keep production moving.
A proposed small works would need:
- A clay storage and preparation area.
- A covered moulding workshop.
- Drying sheds or a controlled drying chamber.
- A kiln area with safe access.
- Covered fuel storage.
- Space for cooling, inspection and finished stock.
- Access for deliveries and collection.
The layout should minimise repeated handling. Clay would move through preparation, moulding, drying and firing, followed by inspection and storage.
Before acquiring or developing a site, the organisers should establish the planning and environmental requirements with the relevant authorities. Clay extraction and brick manufacture raise separate questions. The requirements depend on the location, scale and process, including kiln emissions. The UK nations have different regulatory arrangements.
Making the bricks
Clay preparation involves breaking down and mixing the material to obtain a consistent body. A small works might use a clay mixer or pugmill, with hand moulding for suitable products.
Moulds must allow for the shrinkage established through trials. Newly moulded bricks then need controlled drying before firing. Drying too quickly or unevenly can damage them.
The kiln heats the dried bricks according to a firing programme suited to their clay. Cooling also needs control. The finished bricks are inspected and sorted. This sequence requires practical experience as well as equipment.
Handmaking can provide skilled employment. Sensible machinery can reduce exhausting preparation and handling work. A localist enterprise should choose equipment which it can maintain and afford.
Building the kiln
The kiln is likely to be the most demanding part of the project.
For modest, intermittent production, a batch kiln would be worth investigating with an experienced kiln designer. Its capacity should match both demand and the drying facilities.
Construction requires suitable refractory materials, insulation, foundations, combustion equipment, flues and temperature monitoring. The detailed design must follow from the chosen clay, fuel and production rate. A general sketch is insufficient for building a reliable commercial kiln.
An oversized kiln could leave the business waiting for enough orders to fill it. An undersized one could consume too much labour and fuel for the output obtained.
Fuel and the wood economy
Wood firing deserves investigation where a dependable woodland supply exists. H.G. Matthews shows that it can be used commercially. Its wood-fired kilns hold about 60,000 bricks and are stoked day and night for up to five days. This illustrates the commitment involved.
A proposed works would need a fuel budget based on trial firings. Available woodland growth would have to be considered alongside competing needs for household heat and other uses.
Wood fuel also needs preparation, drying and storage. Local availability does not make its cost or environmental effects disappear.
Recovering kiln heat for drying could improve the process where the design permits it. The appropriate arrangement would need specialist assessment.
Quality and viability
Bricks intended for buildings need evidence of performance. Relevant tests include strength, water absorption and resistance to freezing and thawing. Their suitability depends on the intended application and exposure.
The works would also need records linking each batch to its clay mixture, drying conditions and firing programme. These would help identify faults and maintain consistency.
Before full production, the organisers should calculate the cost per saleable brick. The calculation must include rejected bricks, labour, fuel, testing, equipment upkeep and delivery.
The most credible route is gradual: establish demand, test the clay, obtain trial firings, confirm the site requirements and only then commission the permanent facilities.
A local brickworks could become an enduring part of a locality’s essential economy. Its value would come from reliable materials, skilled work and the ability to maintain buildings close to home.